1. Adjustment of the top angle of the angle steel
After the power angle steel tower is inserted into the angle steel, the top angle of the angle steel shall be adjusted immediately. The adjustment shall be carried out step by step. Generally, the level must be used to deflect the angle steel edge node in the direction of the parallel line of the foundation. The meter ruler shall be used to carry out accurate and precise measurement of the angle steel edge node, and the top angle shall be adjusted according to the angle steel guy and the upper positioning equipment.
2. Adjustment of angle steel distortion
During the construction of the power angle steel tower, the angle bisector shall be made at one corner of the triangle plate, and the angle shall be close to the two sides on the inside of the plug-in angle steel. The horizontal meter shall be used to deflect in the direction of the parallel line with the foundation. The angle steel shall be adjusted according to the angle steel wire and the angle steel twist of the special tool fixed above. If the angle bisector of the triangle plate overlaps with the internal bisector of the level meter, the angle steel shall not be twisted.
After the power angle steel tower is inserted into the angle steel, the top angle of the angle steel shall be adjusted immediately. The adjustment shall be carried out step by step. Generally, the level must be used to deflect the angle steel edge node in the direction of the parallel line of the foundation. The meter ruler shall be used to carry out accurate and precise measurement of the angle steel edge node, and the top angle shall be adjusted according to the angle steel guy and the upper positioning equipment.
2. Adjustment of angle steel distortion
During the construction of the power angle steel tower, the angle bisector shall be made at one corner of the triangle plate, and the angle shall be close to the two sides on the inside of the plug-in angle steel. The horizontal meter shall be used to deflect in the direction of the parallel line with the foundation. The angle steel shall be adjusted according to the angle steel wire and the angle steel twist of the special tool fixed above. If the angle bisector of the triangle plate overlaps with the internal bisector of the level meter, the angle steel shall not be twisted.

(1) Adjustment of the top angle of angle steel
After the power angle steel tower is inserted into the angle steel, the top angle of the angle steel shall be adjusted immediately. The adjustment shall be carried out step by step. Generally, the level must be used to deflect the angle steel edge node in the direction of the parallel line of the foundation. The meter ruler shall be used to carry out accurate and precise measurement of the angle steel edge node, and the top angle shall be adjusted according to the angle steel guy and the upper positioning equipment.
(2) Adjustment of angle steel distortion
During the construction of the power angle steel tower, the angle bisector shall be made at one corner of the triangle plate, and the angle and the two sides on the inner side of the plug-in angle steel shall be close to the price of the structural support. The direction of the parallel line between the level gauge and the foundation shall be used to deflect. The angle steel shall be adjusted according to the angle steel wire and the fixed special tool above. If the angle bisector of the triangle plate and the internal bisector of the level gauge overlap, the angle steel shall not be twisted.
HENGFENGYOU ELECTRIC GROUP, is an electrical enterprise with transmission and distribution industry as its main business, integrating product research and development, manufacturing and trade. Designated suppliers for the world's top 500 enterprises .Its main products include power transformers, medium and low voltage switchgear, distribution panel ,circuit breakers, transmission tower ,Cable and other power distribution equipment , HENGFENGYOU ELECTRIC GROUP has been working hard to provide the best transmission, distribution solutions for users all over the world. www.transmission-tower.com ; sales@hengfengyou.com ; WhatsApp:+86158 5325 2696(Jack)