(2) Transmission line tower equipment: hydraulic cylinder loading, of which the longitudinal hydraulic loading system is equipped with 20 sets of hydraulic cylinders with loading capacities of 400kN (8 sets) and 200kN (6 sets) and 120kN (6 sets); The loading system is equipped with 16 sets of hydraulic cylinders with loading capacities of 400kN (4 sets), 200kN (6 sets) and 120kN (6 sets).
(3) Measurement and control equipment: According to the load spectrum set by the computer, the 64 load channels are simultaneously loaded with closed-loop automatic coordination, the measurement and control period is 0.5s, and the loading error is ±1%; the strain measurement adopts the computer to automatically measure the strain at 80 points, and Point real-time monitoring; displacement measurement using total station measurement.
(4) Assembly equipment: one 80kN and one 300kN orbital tower crane.
(5) Monitoring equipment: equipped with 16 sets of video monitoring systems.